Skip Navigation

Bond Program by School:Quantum Academy Modernization Projects

Quantum Academy–Front of School

Series A work scope includes minor tenant improvements and the addition of a science lab to support a total of 320 students.

The Plans

Blueprints for the Quantum Academy campus

Addition of Three New Classrooms

Site Preparation & Construction

Quantum Academy Pool (before)

An old therapy swimming pool before removal

A recently graded building pad ready for new construction

The pool location after removal and grading

Three classrooms under construction

New classrooms being stuccoed and painted

A rooftop of a new classroom with air conditioning and other equipment

Interior of a new classroom will unfinished floor and ceiling tiles installed

After Completion

An empty classroom with a checkered tile floor

A new classroom with multiple group tables and chairs

A new classroom with a large computer screen and multiple tables with chairs

New Lunch Area

Construction Progress

A new concrete slab for an outdoor lunch area

A on outdoor shade structure made from metal

After Completion

A blue and white metal rooftop over outdoor lunch tables

New blue metal lunch tables

A blue and white metal rooftop over outdoor lunch tables

New Fire Lane and Waterline

Map of the new fire lane between Orange Glen Elementary and Quantum Academy

Map of the new fire lane between Orange Glen Elementary and Quantum Academy

construction worker working in a trench hooking up a water line

Hooking up new water line for fire safety

New water valve for fire safety

New water valve for fire safety

Fire lane with fresh blacktop and painted red lines

The new fire lane between Quantum Academy and Orange Glen Elementary

Fire lane with fresh blacktop and painted red lines

New fire lane between Quantum Academy and Orange Glen Elementary

Medical Therapy Unit

The new medical therapy unit building being lowered by crane into its new location.

The new medical therapy unit building being lowered by crane into its new location.

New medical therapy unit near completion.

New medical therapy unit–Almost ready!

Upgraded Interior Spaces

new wooden beam across the top of the hallway where new interior doors will be going

Interior hallway under construction

Quantum Academy Corridor (after)

Quantum Academy Corridor (after)

Removal of All Interior Walls (5, 6, 7 & 8)

Removal of All Interior Walls (Old Rooms 5, 6, 7 & 8)

Quantum Academy – Classroom Expansion

Quantum Academy – Classroom Expansion

Teachers Lounge

Exterior Concrete At New Lounge Location

Exterior Concrete At New Lounge Location

Demolition of Existing Lounge

Demolition of Existing Lounge

chairs arranged around rectangular tables. new bathroom door on the side wall

New teachers lounge with a new bathroom as well

Technology Infrastructure

Series A work scope includes upgraded WiFi and wired networking equipment, upgraded copper and fiber cabling, improved electrical and environmental systems.

95% Complete

New Exterior Landscaping and Hardscape

A tree, sand, and dirt in front of a school building

A tree, sand, and dirt in front of a school building

A pathway of concrete pavers alongside dirt and asphalt on a school playground

A large area of asphalt on a school playground

Exercise equipment on a school playground