Bond Program by School:Quantum Academy Modernization Projects

Quantum Academy–Front of School

Series A work scope includes minor tenant improvements and the addition of a science lab to support a total of 320 students.

The Plans

plans showing the addition of a building and improvements to the Quantum Academy campus

Plans for Quantum Academy

Addition of Three New Classrooms

Quantum Academy Pool (before)

Quantum Academy Pool (before)

Quantum Academy Pool (after)

Quantum Academy Pool (after)

Quantum Academy classrooms under construction

Three new classrooms near completion.

painters applying a fresh coat of tan paint

New classrooms getting a fresh coat of paint

Construction workers working on the rooftop of the new classrooms

A view from the rooftop of the new classrooms.

interior of classroom will unfinished floor and ceiling tiles installed

Interior of one of the new classrooms

New Lunch Area

concrete slab for the new outside lunch area

Concrete surface of new outside lunch area

New Fire Lane and Waterline

Map of the new fire lane between Orange Glen Elementary and Quantum Academy

Map of the new fire lane between Orange Glen Elementary and Quantum Academy

construction worker working in a trench hooking up a water line

Hooking up new water line for fire safety

New water valve for fire safety

New water valve for fire safety

Fire lane with fresh blacktop and painted red lines

The new fire lane between Quantum Academy and Orange Glen Elementary

Fire lane with fresh blacktop and painted red lines

New fire lane between Quantum Academy and Orange Glen Elementary

Medical Therapy Unit

The new medical therapy unit building being lowered by crane into its new location.

The new medical therapy unit building being lowered by crane into its new location.

New medical therapy unit near completion.

New medical therapy unit–Almost ready!

Upgraded Interior Spaces

new wooden beam across the top of the hallway where new interior doors will be going

Interior hallway under construction

Quantum Academy Corridor (after)

Quantum Academy Corridor (after)

Removal of All Interior Walls (5, 6, 7 & 8)

Removal of All Interior Walls (Old Rooms 5, 6, 7 & 8)

Quantum Academy – Classroom Expansion

Quantum Academy – Classroom Expansion

Teachers Lounge

Exterior Concrete At New Lounge Location

Exterior Concrete At New Lounge Location

Demolition of Existing Lounge

Demolition of Existing Lounge

chairs arranged around rectangular tables. new bathroom door on the side wall

New teachers lounge with a new bathroom as well

Technology Infrastructure

Series A work scope includes upgraded WiFi and wired networking equipment, upgraded copper and fiber cabling, improved electrical and environmental systems.

95% Complete