Bond Program by School:Quantum Academy Modernization Projects

Quantum Academy–Front of School

Series A work scope includes upgraded WiFi and wired networking equipment, upgraded copper and fiber cabling, improved electrical and environmental systems.

95% Complete


Series A work scope includes minor tenant improvements and the addition of a science lab to support a total of 320 students.

plans showing the addition of a building and improvements to the Quantum Academy campus

Plans for Quantum Academy

Quantum Academy classrooms under construction

Three new classrooms near completion.

exterior of classrooms wrapped with paper and wire

Getting closer!

Construction workers working on the rooftop of the new classrooms

A view from the rooftop of the new classrooms.

concrete slab for the new outside lunch area

New outside lunch area

Map of the new fire lane between Orange Glen Elementary and Quantum Academy

Map of the new fire lane between Orange Glen Elementary and Quantum Academy

construction workers working in a trench hooking up a water line

Hooking up new water line for fire safety

construction worker working in a trench hooking up a water line

Hooking up new water line for fire safety

New water valve for fire safety

New water valve for fire safety

The new medical therapy unit building being lowered by crane into its new location.

The new medical therapy unit building being lowered by crane into its new location.

New medical therapy unit near completion.

New medical therapy unit–Almost ready!

Quantum Academy Corridor (before)

Quantum Academy Corridor (before)

Quantum Academy Corridor (after)

Quantum Academy Corridor (after)

Removal of All Interior Walls (5, 6, 7 & 8)

Removal of All Interior Walls (Old Rooms 5, 6, 7 & 8)

Interior Work

Interior Work

New Rooms 5, 6, & 7 - Installation of Underground Plumbing

New Rooms 5, 6, & 7 – Installation of Underground Plumbing

New Classrooms 5, 6 and 7 Framed

New Classrooms 5, 6 and 7 Framed

Quantum Academy – Classroom Expansion

Quantum Academy – Classroom Expansion

Exterior Concrete At New Lounge Location

Exterior Concrete At New Lounge Location

Demolition of Existing Lounge

Demolition of Existing Lounge

Demolition of Existing Lounge

Demolition of Existing Lounge

New Teacher’s Lounge Rough Plumbing

New Teacher’s Lounge Rough Plumbing

Quantum Academy Pool (before)

Quantum Academy Pool (before)

Pool Demolition & Fence Removal

Pool Demolition & Fence Removal

Pool Demolition and Filling With Dirt

Fill Dirt For Pool Demolition

Backfill and Compacting Where the Pool House Was

Backfill and Compacting Where the Pool House Used to Be

Quantum Academy Pool (after)

Quantum Academy Pool (after)

Proposed New Lunch Area

Proposed New Lunch Area

New Valves

New Valves